Axle Load Survey
Annoor test labs conducted an axle load survey in a static method, which is a full 24hrs test to collect preliminary information regarding the range of heavy axle loads traversing the Major Roads. This is essential so that Road Engineers can design a more robust road network, without going into frequent maintenance due to poorly designed roads and pavements. It also helps them to boost the performance of routine and periodic maintenance and to expand their database of vehicular axle weight.